Monday, April 15 2013
TIME: 7:00 a.m.
LOCATION: at the Taycheedah Town Hall
Special Meeting

AGENDA

The Town of Taycheedah Town Borad will meet at the Taycheedah Town Hall. The Board will then perform site inspections at various locations within the Town of Taycheedah in order to determine road repair and ditch projects for 2013.

At the conclusion of the site inspections, the Town Board will meet at the Town Hall to discuss DNR required modifications to the clean wood and brush site.

This meeting is for information purposes onloy. No official action will be taken.

Brenda A Schneider
Town Clerk

MINUTES

TOWN BOARD
SPECIAL BOARD MEETING
APRIL 25, 2013
7:00 A.M.
TAYCHEEDAH TOWN HALL


Members present were Chairman Jerry Guelig, Supervisors Tim Simon and Mike Wirtz, and Road Supervisor Mike Sabel. Absent were Supervisors John Abler and Jim Rosenthal.

The Town Board of the Town of Taycheedah met for a special meeting for the purpose of conducting the annual road/ditch inspection to determine road repair and ditch projects for the year and to discuss DNR required modifications to the clean wood and brush site. The Clerk Brenda Schneider was not in attendance. Mike Sabel took notes.

The Board performed a site visit to the clean wood and brush burn site. The DNR is requiring several modifications to the site. The Board directed staff to complete all modifications and open as soon as possible. Supervisor Simon departed upon completion of this site visit.

The group toured the Town to inspect numerous roads and ditched.

The following is the 2013 project list for roadwork that will be bid:

1 Rosenthal Court Pulverize/grade-pave 2.0"binder/1.5finish coat
Approx. Area: 300' x 20'
Project location: cul de sac

2 Rosenthal Court 1.5" overlay
Approx. Area: 250' x 20'
Project location: CTH QQ to cul de sac

3 Billene & Hillside Cir Pulverize, grade, pave 2.5"
Approx. Area: 4,200' x 20'
Project location: Badger Lane to and thru circle

4 Schaefer Road Pave 2.0" binder/1.5 finish coat
Approx. Area: 2,500' x 20'
Project location: CTH WH thence north

5 Glen St. Pave 2.0" binder/1.5 finish coat
Approx. Area: 100' x 6' patch

6 Birschbach Drive Pave 2.0" binder/1.5 finish coat
Approx. Area: 100' x 14'
Project location: Seven Hills Road thence west

7 Silica Road Wedge-mill two butt joints-1.5" overlay
Area 1: approx. area 26' x 20'
Area 2: approx. area 51' x 20'
Area 3: approx. area 51' x 20'



8 Fisherman's Rd. Wedge-mill two butt joints-1.5" overlay
Approx. Area: 30' x 20'
Project location: @ Perch Lane

9 Deadwood Point Rd Wedge-mill two butt joints-1.5" overlay
Area 1: approx. area 20' x 20'
Area 2: culvert patch-approx. area 20' x 20'

10 Tower Road Wedge and slag seal
Approx. Area: 3,275' x 20'
Project location: Golf Course Dr. to Schmitz Rd.



Chairman Guelig declared the meeting adjourned at 10:24 am.


_______________________________________
Brenda A. Schneider
Clerk




Search for Events by selecting a Month.
Month
Town of Taycheedah
Fond du Lac County, Wisconsin
info@townoftaycheedah.com

Officials | Calendar | Announcements | Legal Notices | Newsletter | Procedures | Links | History | Ordinances | Comprehensive Plan | Map | Kiekhaefer Park | Home